العربية | English

News

Week 2: Al-Mustaqbal University Students Inspect Chiller Installations and Ductwork at the Teaching Hospital

Week 2: Al-Mustaqbal University Students Inspect Chiller Installations and Ductwork at the Teaching Hospital

04 August 2026    86 Views

Under the direct supervision and close follow-up of the "Al-Mustaqbal Energy Research Center," College of Engineering Technology students at Al-Mustaqbal University continued their advanced field applications on the third day of the second week of their intensive summer internship program, focusing on the Teaching Hospital's Service Building. The third day centered on large-scale central mechanical and thermal systems, where students received detailed, on-site engineering instructions covering: Chiller Installation & Mounting Procedures: The technical process of anchoring central cooling units onto vibration-isolation pads, ensuring proper balancing for optimal performance and noise reduction. Ductwork Design & Routing: The methods for installing and routing air ducts and cooling lines from chillers and Air Handling Units (AHUs) through service tunnels and corridors leading to the main hospital facility. Auxiliary System Integration: Reviewing chilled water pump networks, control valves, and refrigerant distribution piping. These field tours reinforce the university's commitment to providing a real-world learning environment that equips students with comprehensive, hands-on expertise to design and manage complex mechanical systems in critical infrastructure projects.

Tags
#Education #Seminar #Conference #Research

Images Attachments